Ready to play
Ready to play
The Greater Amman Municipality announced a partial closure of the Airport Bridge early on Friday, July 24, 2026, for maintenance work on expansion joints on the bridge in the Marka area. The right lane on top of the bridge heading towards Zarka-Amman will be closed from 1 a.m. to 8 a.m., with traffic diversions implemented in coordination with the Traffic Department. These diversions include vehicles descending from the top of the bridge to the lower level and then continuing via the Jordan Army Street. The municipality called on drivers to adhere to traffic instructions to ensure safety during the work period.
Notice: This Is an AI-Generated Summary
Comments (0)