24 Hrs
Source:
شبكة شام الإخبارية
شبكة شام الإخبارية
Ready to play
Ready to play
Deir ez-Zor Province shows that the area has entered a recovery phase after the water level of the Euphrates River stabilized and the flood risk diminished. All gates of the Euphrates Dam have been closed, and the drinking water plants are being reactivated. Additionally, assessments are underway to evaluate the agricultural and service damages caused by the flood.
Notice: This Is an AI-Generated Summary
Comments (0)